Houston · PROJECT GALLERY
Dormer-front townhome restoration
Window and wall opening-up work, surface preparation, and later facade views document this townhome’s exterior repairs.
8 project photographs • Houston

FOLLOW THE PROJECT
From the first view
to the latest details.
Photos are presented in the order recorded in the project, with captions describing the visible work and details. Select any photo for a closer look.

Initial front elevation
Stucco townhome with a dormer above the garage

Window edge opened
Exposed material beneath a window

Stucco surface preparation
Stucco repair coat across the wall below a window

Sheathing around windows
Wood sheathing and protected window openings

Facade progress
Stucco facade and garage during exterior work

Scaffolding in place
Scaffolding across the front of the townhome

Later side elevation
Later view of the townhome’s light stucco facade

Later entry detail
Entry door with narrow windows and stucco trim
